1.6 Million BTU Direct Fired Gas Heater

Model: HR1500
Makeup air temporary heaters are ideal to warm a large construction project or industrial building. High static pressure combined with the 1,600,000 BTU burner will heat your desired space while pressurizing the building to prevent moisture infiltration. This heaters high static fan is ideal to run long lengths of duct or quickly pressurize a warehouse, data center or commercial project. Facility managers love this line of heaters because of their ability to operate on 208-230 volts.
  • Style: Direct-Fired
  • Weight: 992 lbs.
  • Weight Range For Filtering: 1001 – 3,000
  • Dimensions: 62.5″ x 31.5″ x 92″
  • Dedicated Power: YES
  • Safety: OSHA Compliant
  • Certified: Omni Testing Labs
  • BTUs: 1600000 BTUs
  • Extension Cord Max Length: 10/4 Cable
  • Supply Connection: 23″ x 27″ Metal
  • Return Connection: Outdoor Unit
  • Discharge Duct Length: 100′ Maximum
  • Intake Duct Length: N/A
  • High Temp Duct: Yes
  • Metal Duct Flange: 23″ x 27″
  • Thermostat Setting: 55 degrees
  • Fuel Type: Natural Gas Or Liquid Propane
  • Pipe Fitting: 1″ Union Fitting
  • Regulator (Included): Maxitrol 325-9-1212-002
  • Natural Gas Min. Inlet Pressure: 14 w.c.
  • Propane Min. Inlet Pressure: 14 w.c.
  • Air Displacement: 9,450
  • Static Pressure: 2″
  • Fuel Consumption Therms: 25
  • Voltage: 208 – 230 Volt
  • Voltage Range For Filtering: 201 – 300
  • Phase: 1 PH or 3 PH
  • Amp Draw: 30.6/19
  • Amp MCA: 40/40

Protective goggles and gloves are recommended. Read and follow all safety information included in user manual prior to use.

Our rental process

Step 1: We work with you to calculate your industrial climate conditioning needs, properly size your project, and select equipment type and placement.

Step 2: We deliver and connect your equipment. We are available around the clock to provide maintenance, and repair services for your rental equipment.

Step 3: Upon request, we will perform safety and quality control checks, help monitor your project, and generate equipment reports.

Related equipment

Scroll to Top